Sunday, November 11, 2007

2-Story House : Roof Beam

Roof beam of 2-story house was almost finished.

Saturday, November 10, 2007

1-Story House : Concrete Floor


First week of November, 2007, I with an architect, looked over the progress of the construction. The car parking and the bathroom concrete floor of 1-story house were built.

Monday, November 5, 2007

Swimming Pool

Swimming pool is one of the selling points of our housing project. The structure will made of reinforced concrete, so it very strong. We have selected overflow system for pool system and salt-chlorinators and sand filter for purification system. For the overflow system, water level will be the same as the edge of the pool, so it looks like natural lake. Salt-chlorinators is better for skin than chorine and it is most acceptable currently. The contractor for the pool system named S.Napa (Thailand), one of the most experienced swimming pool specialists in Thailand. These can assure that our swimming pool is well-built and high quality and standard from reputable pool expert.

The area was ready for installing the system.

The water pipes are installed under the concrete floor while they are working on the electrical line.